Examine cement before using. If jelled, replace. Do not use primers or cleaners to thin out cement. Use within 2 years of date stamped on bottom of can.
Cut pipe square and deburr. Clean and dry joining surfaces.
Check dry fit. Pipe should easily go 1/4 to 3/4 of the way into the pipe fitting. Fit should be snug.
Use a suitable applicator at least ½ size of the pipe diameter; for larger sizes use brush or roller.
Apply Black Swan Primer following directions on can.
Apply a full, even layer of cement on the pipe equal to the depth of socket. Coat the fitting socket with a medium layer. Avoid excess and puddling. If necessary, apply a second, full layer on pipe. Cement should fill all gaps.
On bell end pipe, do not coat beyond socket depth or allow cement to run beyond bell.
Assemble quickly while cement is wet. If not wet, re-coat parts before assembly. Ensure pipe bottoms into fitting socket. Twist 1/8 to 1/4 turn; avoid push-out and allow for initial set, hold for about 30 seconds. Wipe off excess.
Allow 15 minutes for good handling strength and 2 hours cure time for temperature above 60°F (16°C) before pressure testing up to 180 psi. For pipe sizes over 2″, higher pressure, or temperatures below 60°F (16°C), allow longer cure time. For more information, read Black Swan Set and Cure Time Bulletin.
Pressure test often so as to eliminate possible large failures.
Problems In Hot Weather
Often, in working with pipe in hot weather, direct rays of the sun may cause surface temperature of pipe to rise to as much as 150° F which is the approximate boiling point of the cement. When cement is applied to such hot surfaces, solvent will evaporate and be gone before any etching action can begin on pipe surface or before pipe can be slipped into fitting socket.
Suggestions for Cementing Pipe in Hot Weather
Problems in Cold Weather
In extremely cold weather it takes a much longer time period for the cement to work. Also, snow and moisture can make it more difficult to make a successful joint.
Suggestions for Cementing Pipe in Cold Weather
| Temp. Range | Pipe Sizes 1/2″ to 1-1/4″ | Pipe Sizes 1-1/2″ to 3″ | Pipe Sizes 3-1/2″ to 8″ | Pipe Sizes 10″ to 15″ | Pipe Sizes 15″+ |
|---|---|---|---|---|---|
| 60º – 100ºF | 15 min. | 30 min. | 60 min. | 2 hrs. | 4 hrs. |
| 40º – 60ºF | 1 hr. | 2 hrs. | 4 hrs. | 8 hrs. | 16 hrs. |
| 0º – 40ºF | 3 hrs. | 6 hrs. | 12 hrs. | 24 hrs. | 48 hrs. |
Cement goes through three stages during it’s working life-thin syrup stage, thick and doughy stage and solid stage. During the thin syrup stage the pipe and fitting are placed together and the initial bond is being made between the pipe, cement and fitting. The second stage is where the solvents are starting to evaporate from the cement and the bonding process is continuing. It is during this thick and doughy stage that the joint should not be moved. At this point the joint is weak and movement could break the connection. And, because the cement is too thick it won’t be able to flow back into place to make the connection again. The solid stage is where all the solvents in the cement have evaporated and the joint will be ready for handing and use.
Set times given are estimates. There are many variables that enter into the set times and the end user must make the final determination.
| Temp. Range during assembly and cure periods | Pipe Sizes 1/2″ to 1-1/4″ (up to 180 psi) | Pipe Sizes 1-1/2″ to 2″ (above 180 to 370 psi) | Pipe Sizes 2 1/2″ to 8″ (up to 180 psi) | Pipe Sizes 2 1/2″ to 8″ (above 180 to 315 psi) | Pipe Sizes 10″ to 15″ (up to 100 psi) |
|---|---|---|---|---|---|
| 60º – 100ºF | 1 hr. | 6 hrs. | 2 hrs. | 12 hrs. | 24 hrs. |
| 40º – 60ºF | 2 hrs. | 12 hrs. | 4 hrs. | 24 hrs. | 48 hrs. |
| 0º – 40ºF | 8 hrs. | 48 hrs. | 16 hrs. | 96 hrs. | 8 days |
Cure times given are estimates. There are many variables that enter into cure time and the end user must make the final determination.
| Pipe Sizes | Pint | Quart | Gallon |
|---|---|---|---|
| 1/2″ | 150 | 300 | 1200 |
| 3/4″ | 100 | 200 | 800 |
| 1″ | 60 | 120 | 480 |
| 1-1/2″ | 45 | 90 | 360 |
| 2″ | 30 | 60 | 240 |
| 3″ | 20 | 40 | 160 |
| 4″ | 15 | 30 | 120 |
| 6″ | 5 | 10 | 40 |
| 8″ | 2 | 4 | 16 |
| Field | Value |
|---|---|
| Shipping Name | Adhesives, Containing a Flammable Liquid |
| Hazardous | Yes |
| Hazard Class | 3 |
| I.D. Number | UN1133 |
| Packing Group | II |
| Freight Class | 55 |
| Label Required | Flammable Liquid |
| Field | Value |
|---|---|
| Shipping Name | Consumer Commodity |
| Hazardous | No |
| Hazard Class | Limited Quantity |
| I.D. Number | UN1133 |
| Freight Class | 55 |
| Label Required | None |
Pictograms:
Signal Word: Danger
Hazardous Statements:
Precautionary Statements:
First-Aid:
Inhalation: Move into fresh air. If not breathing, give artificial respiration. If breathing is difficult, give oxygen and call physician.
Skin: Remove contaminated clothing and shoes. Wash skin thoroughly with soap and water.
Eyes: Flush with plenty of water for 15 minutes. If irritation persists, get medical attention.
Ingestion: Give 1 or 2 glasses of water. DO NOT INDUCE VOMITING. Consult physician immediately.
Storage:
Store in cool, dry, well-ventilated area away from incompatible material. Store in shade between 40 degrees F to 110 degrees F. Keep container closed when not in use. Keep away from heat, sparks, open flame and other sources of ignition.
Incompatible Materials: caustics, ammonia, inorganic acids, chlorinated compounds, amines, strong oxidizers and isocyanates.
Disposal:
Dispose of product or container in accordance with federal, state or local regulations.